Case study | Food & beverage warehousing

Forklift fleet right sizing with UgoPilot and operational data optimization

Key metrics

$1.12M saved globally over 18 months

through fleet reduction, energy optimization, and battery room elimination

–47% MHE required

while maintaining operational volume and production capacity

+484,000 pallets moved in the first 12 months

thanks to battery change elimination and improved truck performance

$55,000 in energy savings

from a reduction of 330,000 kWh, equivalent to 140 metric tons of CO₂ annually

Panorama of industrial bottled beverage storage

Company overview

The customer is an American multinational food company operating numerous manufacturing facilities, corporate offices, and distribution centers in North America. Their 20,000+ employees are determined to lead the future of the food industry.

F&B warehousing and distribution

Trusted partner

United States

Challenges

The use case is about a USA based warehousing and distribution site, running a forklift fleet of over 135 trucks. 24/7 material handling operations were performed with a traditional lead acid and battery room infrastructure. They used a 1.7 to 1 battery to truck ratio and were seeking for optimization opportunities: 

Solutions

The performance of lithium-ion batteries against their lead acid counterpart justified the transition. The customer’s choice went to UgoWork, when compared with other lithium-ion solutions, because of the cloud-connected lithium-ion batteries, but most importantly on account of the UgoPilotTM software platform capabilities and energy expertise.

Insights from data trends and industry benchmark leading to fleet right sizing

Improved energy efficiency, electricity cost and CO₂ emissions reduction

Proactive service and cloud-connected batteries minimizing downtime

Lift truck operator with technician looking at lithium-ion battery in a sit-down counterbalanced forklift.

Turning fleet data into operational savings.

Benefits

Fleet right sizing

Productivity increase

Energy efficiency

“Over the 14 months it took to optimize our first site, UgoWork provided recommendations that allowed us to gain speed and autonomy in reaching the same results in other locations.”

Logistics Project Execution Manager